Ledger To Concrete Wall Connection
Properly installing a ledger board for your deck is one of the most important structural components of building a safe and strong deck.
Ledger to concrete wall connection. Additionally it goes detail by detail ledger connection joist to beam connection beam to post connection etc through a typical deck and identifies the relevant building code requirements 2012 and 2015 irc ibc and connection options. Simpson strong tie category masonry connectors we use cookies on this site to enhance your user experience. Put the ledger board in place once more. Mark these locations on the wall with a pencil.
Using a 3 8 masonry bit in the hammer drill drill the holes through the wall in the places that you marked. Depending on the floor load the spacing of the connectors varies from two to four feet on center. These 18 articles will teach you how to install flashing and bolt the ledger connection to the house rim. Insert the expansion anchors into these holes so that they are flush with the wall.
Steel bar joists typically use pocketed or ledger connections to concrete masonry walls. The connectors are installed at floor height. Step 5 attach the ledger board to the wall. A popular method of attaching the ledger boards to the walls is with the icf ledger connector this steel connector is embedded in the concrete when the wall is cast.
T able of c ontents c hapter 1 m asonry c avity w all d etails s hear c onnected c hapter 2 m asonry c avity w all d etails a djustable t ies c hapter 3 b rick v eneered s teed s tud b ackup w all d etails s hear c onnected c hapter 4 b rick v eneered s teel s tud b ackup w all d etails s lotted t ies c hapter 5 s ingle w ythe l oadbearing m asonry w all d etails c hapter 6 m. Ledger board attachment to a solid concrete foundation wall when attaching a ledger board to a masonry wall you will want to first cut the ledger board to size and have two helpers hold it in place so you can drill two holes every 12 through the wood where your bolts will be installed. By clicking i agree below you are giving your consent for us to set cookies. On this project the 2 10 joists of the main deck frame sit just about even with the top of the foundation and a landing framed with 2x8s sits atop the main frame serving as a transition point between the lowered deck and the patio door.
The ledger is not only the structural connection between the deck and the house. Concrete foundation wall the fourth technique involves securing the ledger to a concrete foundation wall rather than to the first floor band board. Proprietary systems that use concrete masonry units as a filler between the steel joists are also available. The holes need to be at least three inches deep into the wall.